X hits on this document

136 views

0 shares

0 downloads

0 comments

3 / 50

Introduction

This installation manual was written to assist with the installation of Thermo King MD-200 & MD-300 systems onto truck bodies specifically designed and built for refrigerated applications.

Due to its complexity, you should not attempt this installation unless you:

 

Are an experienced mechanic Can safely lift 34 kilos (75 lbs) Are certified and trained in the repair and maintenance of diesel

 

powered refrigeration systems. Have a basic understanding of electricity and electrical wiring Have the necessary tools and equipment to complete the installation.

This manual is published for informational purposes only. Thermo King makes no representations warranties express or implied, with respect to the information recommendations and descriptions contained herein. Information provided should not be regarded as all-inclusive or covering all contingencies. If further information is required, Thermo King Corporation Service Department should be consulted.

Thermo King’s warranty shall not apply to any equipment which has been “so installed, maintained, repaired or altered as, in the manufacturer’s judgment, to affect its integrity.”

Manufacturer shall have no liability to any person or entity for any personal injur , property damage or any other direct, indirect, special, or consequential damages whatsoeve , arising out of the use of this manual or any information, recommendations or descriptions contained herein.

3

Document info
Document views136
Page views136
Page last viewedFri Dec 09 05:07:15 UTC 2016
Pages50
Paragraphs453
Words4996

Comments