of Staking/Permit to Drill, and U.S. Environmental Protection Agency NPDES General Permit and SPCC plan will be necessary for the project to proceed.  The following state permits and approvals may pertain to the project:

ADNR Water Use Permit

ADEC Storm Water Pollution Prevention Plan

ADEC General Permit for Excavation Dewatering Wastewater Disposal

ADEC General Permit for Hydrostatic Testing Wastewater Discharge

AOGCC Permit to Drill and Sundry Notice

ADEC Temporary Drilling Waste Storage Plan Approval

SHPO Cultural Resource Clearance

It is not anticipated that an Oil Discharge Prevention and Contingency Plan will be required for this gas project.  The applicant will submit a request to the ADEC and AOGCC for a waiver for this requirement since liquid hydrocarbon (oil) is not expected in the stratigraphic intervals believed to contain natural gas.  It is also not anticipated that any access road or pipeline will cross a stream specified by ADF&G as being important for the spawning, rearing, or migration of anadromous fish, or any stream that supports resident fish species.  Therefore, an ADF&G Fish Habitat Permit will likely not be required.   Exploration drilling will be conducted under ADEC air Permit-by-Rule.  Letters of non-objection will be secured from TNC.  