    • 3.

      From California but other than from the CAISO markets.

    • 4.

      From a region of origin that is unknown. Retail providers, other than multi-jurisdictional retail providers, shall report unspecified power purchased from an unknown region as an import under sections 95111(b)(2)(C) or section 95111(b)(2)(D), as applicable. Multi-jurisdictional retail providers shall include power purchased from an unknown region under section 95111(b)(3)(G).

  • (G)

    Multi-jurisdictional retail providers shall include wholesale power purchased or power taken from specified sources and wholesale power purchased from unspecified sources not already reported under section 95111(b)(3)(E) or section 95111(b)(3)(F)1-3, designating the region of origin as PNW, SW, or unknown, as applicable.

  • (H)

    Power purchased or taken (MWh) from a specified hydroelectric generating facility with nameplate capacity of > 30 MW (that is not a California eligible renewable resource) or from a specified nuclear facility shall be listed as one of the following:

    • 1.

      Power purchased with a contract in effect prior to January 1, 2008 that remains in effect or has been renegotiated for the same facility within one year of contract expiration;

    • 2.

      Power purchased not meeting the stipulation specified in section 95111(b)(3)(H)1. and that is not associated with an increase in the facility’s generating capacity;

    • 3.

      Power purchased not meeting the stipulation specified in section 95111(b)(3)(H)1. that is associated with an increase in the facility’s generating capacity due to increased efficiencies or other capacity increasing actions;

    • 4.

      Power purchased from hydroelectric generating facilities during a “spill or sell” situation where power not purchased is lost.

    • 5.

      Power purchased that does not meet the stipulation specified in section 95111(b)(3)(H)1. due to federal power redistribution polices for federally owned resources and not related to price bidding.

  • (I)

    Native Load. The retail provider may elect to designate the power taken from a generating facility partially or fully owned, or operated by the retail provider and power purchased or taken from other specified sources as serving native load if the facility meets one of the following criteria and shall state which of the criteria were met:

    • 1.

      The generating facility is a California eligible renewable resource and, prior to the reporting date, the reporting entity has retired the WREGIS or NVTREC certificates associated with the power received from the facility during the report year.