X hits on this document

PDF document

REGULATION FOR THE MANDATORY REPORTING OF GREENHOUSE GAS EMISSIONS - page 48 / 137

351 views

0 shares

0 downloads

0 comments

48 / 137

    • 2.

      The generating facility is a hydroelectric generation facility.

    • 3.

      The generating facility is partially or fully owned by the retail provider, operated by the retail provider, or under a long term power contract. If a facility is designated as serving native load on this basis, all generating facilities from which the retail provider purchases or takes specified power that run at the same or greater average annual capacity factor shall also be designated as serving native load.

    • 4.

      The generating facility is a qualifying facility whose generation the reporting entity purchases under a power contract.

  • (J)

    Retail providers shall designate a wholesale sale as inside California if the point of delivery of the sale is within California. If retail providers cannot provide documentation that the point of delivery of the sale is within California, then retail providers, not multi-jurisdictional, shall report the wholesale sale as an export under section 95111(b)(2)(E) or section 95111(b)(2)(F), as applicable, and multi-jurisdictional retail providers shall include the sale under section 95111(b)(3)(O).

  • (K)

    Wholesale sales (MWh) of power purchased or taken from specified facilities operated by the retail provider delivered to point of delivery inside California and the designation of the region of destination as CAISO real-time market, CAISO integrated forward market, or California.

  • (L)

    Wholesale sales (MWh) of power purchased or taken from specified sources not operated by the retail provider delivered to point of delivery inside California and the designation of the region of destination as CAISO real-time market, CAISO integrated forward market, or California.

  • (M)

    Wholesale sales (MWh) of power purchased from unspecified sources delivered to counterparties inside California and the designation of the region of destination as CAISO real-time market, CAISO integrated forward market, or California.

  • (N)

    Multi-jurisdictional retail providers shall indicate those wholesale sales included in section 95111(b)(3)(K)-(M) for which they are the deliverer to the first point of delivery in California (not located within their own service territory.)

(O) Multi-jurisdictional retail providers shall include wholesale sales (MWh) of power purchased or taken from specified or unspecified sources not already reported in section 95111(b)(3)(K)-(N).

48

Document info
Document views351
Page views351
Page last viewedTue Dec 06 22:22:14 UTC 2016
Pages137
Paragraphs3283
Words41863

Comments