X hits on this document

249 views

0 shares

0 downloads

0 comments

4 / 108

    • 4.5

      Exploration of Possible Areas of Bias in SQG Performance Results……………87

    • 4.6

      Next Steps………………………………………………………………………..88

Section 5: Auto Body Sector…………………………………………………..………..90

    • 5.1

      Common Auto Body Sector Definition………………………………………….90

    • 5.2

      Common Auto Body Performance Indicators……………………………………91

    • 5.3

      Determining a Reasonable Sample Size for Drawing Statistical Conclusions about the Auto Body Group……………………………………………………...93

      • 5.3.1

        Sample Size Needed to Benchmark an Individual State’s Sector Performance……………………………………………………………...93

      • 5.3.2

        Sample Size Needed to Compare Performance Levels between States….95

    • 5.4

      Universe Identification and Random Sample……………………………………95

    • 5.5

      Auto Body Sector Conclusion……………………………………………….…106

Section 6: Project Conclusion and Recommendations………………….…………..107

Appendices……………………………………………………………………………..108 The Common Measures Project Appendices listed below are available at: http://www.newmoa.org/hazardouswaste/measures/index.cfm

  • A.

    Quality Assurance Project Plan (QAPP)

  • B.

    EPA Quarterly Reports

  • C.

    Introductory Training and Quality Measurement Slides

  • D.

    Individual State Responses to Group Preference Checklists

  • E.

    Aggregated Data on Group and Indicator Evaluation Charts

  • F.

    Data Quality Considerations When Selecting Groups

  • G.

    Complete List of States’ SQG Indicators by Indicator Category

  • H.

    How to Generate a Random Sample

  • I.

    Training Attendance Log

  • J.

    Quality Assurance Procedures

  • K.

    Confidence Intervals for each State’s SQG Achievement Rate and Mean Facility Score at the 85%, 90%, and 95% Levels

  • L.

    Statistically Significant Differences in each State’s SQG Achievement Rate and Mean Facility Scores at 85%, 90%, and 95% Confidence Levels

  • M.

    Histograms for each State’s Facility Scores for “All,” “Regulatory” and “Beyond Compliance” Indicator Groups

The States Common Measures Project Final Report

4

Document info
Document views249
Page views249
Page last viewedTue Dec 06 15:37:27 UTC 2016
Pages108
Paragraphs3821
Words29990

Comments