FAO-PAP/RAC-MICOA

INFRASTRUCTURE PRELIMINARY PROJECTS - Xai-Xai IDP

Hotel Beds

Reside nts/

Camp Visitors / Village residen ts

Water demand

Public use

Guest

M3/day

M3/day

Table 12

Water Demand for Existing and Proposed Future Development

Area - Development Cell -

Segment - Section

Cumulative Water demand M3/day

Cell T1

T1-1

T1-2

Cell P1

P1

Cell T2

T2

Cell P2

P2

Cell T3

Lower

Upper

Cell P3

P3

Cell T4

T4-1

T4-2

Cell P4

P4

Rate per person M3 /day

Praia Velha

Xai-Xai Beach

Above the Camp site

Camp site

50/500 concessions

Camp Site to Praia do Alho

-

1,000

-

-

2,000

-

-

-

-

150

1,700

-

500

200

-

500

-

500

-

1,000

-

200

200

-

1,500

-

-

0,15

0,1/0,08

2,000

-

0,3

-

-

-

-

T5-1

400

400

250

T5-2

600

1,500

250

P5

-

-

-

Front

1,000

-

-

Back

-

1,000

-

P6

-

-

-

Lower

150

-

-

Upper

-

-

Praia do Alho

Praia do Chongoene

Sports Centre

Macamwine Chinunguine New Area Chongoene

Sub Total

Cell T5

Cell P5 Cell T6

Cell P6 Cell S

V1 V2 V3 V4

5,000

11,000

2,500 2,500 2,000 1,000

9,000

10

460

25

505

15

440

20

770

25

660

15

465

15

60

640

150 300

205 430

-

- 300 150

- 300 180 200 150

90 450 300

- 45 - 200 200 160

80

TOTAL PROJECTED WATER DEMAND WHEN AREA FULLY DEVELOPED IN 20 YEARS

4,000 m3/

YEAR 2018

/day

TOTAL

25,000

4,000

ESTIMATED CURRENT DEMAND IF ALL OCCUPIED IN 1998

400

This translates to an equivalent population of some 25,000 persons during peak holiday periods in the year 2018. Of these some 8,000 would be resident in the existing and new villages.