[1] Ponce de Leon, G. (2008). Graphical Planning Method (A New Network-based

Planning/Scheduling Paradigm.  Presented at the PMICOS 5th Annual Conference, Chicago, IL

[2] Ponce de Leon, G. (1972). Extensions to the Solutions of Deterministic and Probabilistic Project Network Models. Ph.D. Thesis.  Civil Engineering Department, College of Engineering, Univ. of Michigan, MI.

[3] Ponce de Leon, G. (2008). Project Planning using Logic Diagramming Method.  Presented at the AACE International 52nd Annual Conference, Toronto, CA.  

“LDM, with its embedded node construct and time-scaled v. schematic diagramming synergizes what PDM and ADM individually provide.  LDM’s modeling of PDM logic through embeds treats PDM leads/lags as elapsed days of work related to the predecessor and successor, respectively.”

[4] Ponce de Leon, G. (1983).  Overlapping Arrow Networks. Stratagem, A Project Controls Journal 1(2), 1-2.  

Arrow networks can adapt to overlapping logic as well as precedence networks can by adding dummies for each relationship in an arrow diagram even if not required by dummy rules.  

[5] Womack, J.P. & Jones, D.T. (2003). Lean Thinking: Banish Waste and Create Wealth in Your Corporation. New York, NY: Simon & Schuster, Inc.  

In Lean Thinking versus Muda, the authors state “We are all born into a mental world of “functions” and “departments,” a commonsense conviction that activities are to be grouped by type so they can be performed more efficiently and managed more easily...Batches, as it turns out always means long waits…”

[6] Clough, R.H., Sears, G.A. & Sears, S.K. (2000). Construction Project Management. (4th Ed). New York, NY: John Wiley and Sons, Inc.

© 2009 CMAA10