X hits on this document

PDF document

ULTRA PURGE LOW-E - page 3 / 11

38 views

0 shares

0 downloads

0 comments

3 / 11

Directions for Use:

Use with Injection Molding Machines:

  • Run the machine with a natural grade of the plastic resin you are going to purge

  • Adjust the screw back-pressure to allow the loading of Ultra Purge (generally 20 to 30 psi)

*For larger machines (over 200Ton), we recommend reducing the shot size to 10-15% of the maximum shot size

  • Without running the barrel empty, load Ultra Purge at a moderate screw rotation speed and begin injection cycle (we recommend loading the quantity of one time the content of the barrel for machines that are in good working condition)

  • In hard to clean situations, a 3-minute soak time is necessary. *Do not soak longer than 3 minutes

  • When the previously loaded quantity of Ultra Purge is used up, load machine with the next production material. It important not to run the barrel empty to improve Ultra Purge’s performance

  • Continue running machine for a total of 4-5 full shots to eliminate remnants of Ultra Purge within the machine.

  • Begin normal production

Document info
Document views38
Page views38
Page last viewedThu Jan 19 22:28:06 UTC 2017
Pages11
Paragraphs209
Words1933

Comments