FPL-NED Facility Connection Requirements

Original

Effective May 1, 2005

Table of Contents

I.  COMMON REQUIREMENTSPage Number

A.Responsibilities2

B.Site Access2

C.Safety2

D.  Operations3

E.Control Areas3

F.Responsibilities during Emergency Conditions3

G.  Maintenance of Facilities3

H.  Point of Interconnection4

I.  Transmission Line Configurations4

J.Grounding5

K.  Insulation Coordination6

L.Structures6

M.Ratings6

N.Reliability and System Security7

O.Protective Relaying7

P.Metering9

Q.SCADA9

R.Ferroresonance9

S.Future Modifications9

T.Coordination of Impact Assessments10

II. GENERATION

A.Applicability10

B.Process10
C.Configuration10

D.Operations & Safety10

E.Generator Protection Requirements11

F.Support of the Grid12

G.Generator Testing13

H.Power Factor13
I.Interrupting Ratings13
J.Source System Grounding14

K.Generator Data14

L.Generator Telemetry15