Preface

This report is a deliverable from the Growth Thematic Network “Structural Assess- ment, Monitoring and Control “ (SAMCO), which was initiated in October 2001.

The present report constitute the deliverable D.9.1.1“End-Users Requirements” un- der task 9.1 “Bridge end-users needs”. The report presents also the milestone M.9.1.1 “Criteria to interface monitoring and control with bridge management” under task 9.1.

Per Goltermann Leader of task 9.1 “Bridge End users Needs”

Livia Pardi Leader of WP 9 “Bridge Management”