X hits on this document

PDF document

WORK PACKAGE 9: PRACTICAL BRIDGE MANAGEMENT - page 34 / 67

142 views

0 shares

0 downloads

0 comments

34 / 67

SAMCO Final Report 2006 F09 Report on Bridge Management

Rating

  • 0

    – 11

11 – 16 16 - 32 32 - 64

Description No or few non-significant damages Damages may develop in the future or are in its initial step. Damages are already developing. Repair is needed in short/middle-term.

Quite severe damages. The bridge, or part of it, is close to its structural limit. Use restrictions and urgent repair is needed.

Table 16. Rating of the structures and structural components damage degree. Condition rating of the bridge is the combination of indexes: worst condition grade of the individual elements, importance of this element in the bridge and importance of the bridge in the State General Interest Road Network

www.samco.org

Page 34 of 67

Document info
Document views142
Page views142
Page last viewedSat Dec 03 05:16:30 UTC 2016
Pages67
Paragraphs1327
Words16715

Comments