X hits on this document

PDF document

WORK PACKAGE 9: PRACTICAL BRIDGE MANAGEMENT - page 4 / 67

154 views

0 shares

0 downloads

0 comments

4 / 67

SAMCO Final Report 2006 F09 Report on Bridge Management

Table of Contents

1. 2. 2.1 2.2 2.3 3. 3.1 3.2 3.3 3.4 3.5 4. 4.1 4.2 4.3 4.3.1 4.4 4.5 4.6 4.7 4.7.1 4.7.2 4.8 4.9 5. 5.1 5.2

Bridge management Need for assessment Need for monitoring

15 16 16

Bridge management in Europe................................................................. 18

State-of-the-Art Denmark (RAMBOLL) United Kingdom (TRL)

18 21 22

Reporting inspections..................................................................... 22

France (LCPC) Italy (SPEA) Germany (BaSt ) Spain (Geocisa)

25 27 29 32

Introduction ................................................................................................. 5 The infrastructure and the traffic growth in the EU................................... 6

The new EU-memberstates

6

Transport patterns

7

Resources spent on (or in) the infrastructure

10

The European bridges........................................................... The age of the bridges Factors affecting the long-term performance of bridges

.................... 12 12 13

Madrid Regional Road Network...................................................... 32 State General Interest Road Network ............................................. 33

Poland (Ibdim) Norway (NPRA)

35 39

Interfacing monitoring and control with bridge management................ 44

Questionnaire on end-users requirements for monitoring

45

Criteria to interface monitoring and control with bridge management.

52

5.2.1

The “ordinary” cases – the common situation for bridge management. ..................................................................................................... 53

      • 5.2.2

        The “special” cases – where monitoring is commonly used ............ 54

  • 6.

    References ................................................................................................. 55

Annex A. Questionaire on End-users requirements to monitoring for use in practical bridge management........................................................................... 56

www.samco.org

Document info
Document views154
Page views154
Page last viewedSun Dec 04 17:14:19 UTC 2016
Pages67
Paragraphs1327
Words16715

Comments