X hits on this document

PDF document

WORK PACKAGE 9: PRACTICAL BRIDGE MANAGEMENT - page 48 / 67

146 views

0 shares

0 downloads

0 comments

48 / 67

SAMCO Final Report 2006 F09 Report on Bridge Management

Reason for using monitoring in the assessment of a structure ??

Need for this (*=minor, ***=major)

Feedback to design codes Check design assumption Loss of pre-stressing Cable tension Corrosion Carbonation and chlorides ingress Self healing of cracks and corrosion Fatigue crack initiation and progress Shear crack (concrete) Water ingress Vibration and damping Seismic risk Scour Impact of floating debris, boats and ships

Weight in motion Load measurement at support Periodic monitoring (deflections, strains, cracks, loads, etc.) Continuous monitoring (deflections, strains, cracks, loads, etc.) Evaluation of new techniques Loss of stability Explosive collapse

- ∗∗∗ - ∗∗∗ - ∗∗∗ - ∗∗∗ ∗∗ - ∗∗∗ ∗∗ - ∗∗∗ - ∗∗ - ∗∗∗ - ∗∗∗ - ∗∗ - ∗∗* - ∗∗∗ - ∗∗ - ∗∗∗

∗∗ - ∗∗∗

∗∗∗ - ∗∗∗

Table 28. Motivation for using monitoring and the end-users need for such a type of monitoring (range in answers is indicated).

www.samco.org

Page 48 of 67

Document info
Document views146
Page views146
Page last viewedSat Dec 03 22:30:55 UTC 2016
Pages67
Paragraphs1327
Words16715

Comments