2009 Wildwood Water Utility Specifications

Updated 06/29/09

3/4" Resetter - Ford VH33-12

Couplings C38-23-2.5

1 Ford C18-34 Bushing

1" Resetter - Ford VH34-12

Couplings C38-44-2.625

Meter Box CoverFord A-53 – 15” Lid 20” Tile

Service type200 PSI IPS PE

Compression couplingsCO6-44  

     2" Services

Corporation stopsFord FB - 100

Curb stopFord BF53-777W

Straight Check ValvesFord HSF-31-777

Curb boxCENTRAL FOUNDRY 143R

Meter boxMIDSTATE 36" X 36"

Meter box coverFord MC-36-MB RML-12 XX Heavy Duty

Locking Lid

Service type200 PSI CTS PE

Meter Manifolds

The Wildwood Water Utility realizing that there are times when multiple taps on the water main would create a hardship for the owner/developer; therefore the WWU will permit the installation of a single tap with a multiple meter manifold. The WWU will direct the size of the service and the number of meters per manifold. Upon completion the owner/developer shall provide an “as built” to be placed in the account file as a record of the tap to the Utility Inspector. All material and lengths shall be listed. (SEE Figure

POLYETHYLENE CONNECTION PIPE SHALL BE ULTRA HIGH MOLECULAR WEIGHT 200 PSI, TYPE PE 3306, SDR 7 IRON PIPE SIZE POLYETHYLENE TUBING FOR 1" SERVICES, TYPE PE 3306, SDR 9 TUBING SIZE POLYETHYLENE SERVICE TUBING FOR 2” SERVICES, 200 PSI CTS PE.

Polyethylene pipe shall conform to the requirements of ASTM D-1248-65T, ASTM D-2239-65, USDCCS 255-63 and be approved by the NATIONAL SANITATION FOUNDATION for potable water use. Tube size insert stiffeners shall be used with the plastic pipe.

3.0METHODS OF CONSTRUCTION

Excavation and backfill shall conform to the requirements for Sub-surface Excavation. The contractor shall provide adequate equipment and so operate it as to maintain an essentially dry excavation, stable trench bottoms suitable working conditions and protection from water damage through out and until the completion of the work.

NO EXISTING VALVES OR EQUIPMENT SHALL BE OPERATED, NOR SHALL ANY LINE BE CHARGED UNLESS AN AUTHORIZED REPRESENTATIVE OF THE WWU IS PRESENT. THE ONLY EXCEPTION TO THE RULE IS IN AN EMERGENCY, TO PROTECT PUBLIC SAFETY. THE CONTRACTOR SHALL TAKE SUCH ACTION AS IS IMMEDIATELY REQUIRED TO PROTECT PUBLIC SAFETY, AND NOTIFY THE WWU IMMEDIATELY OF THE INCIDENT.