X hits on this document

24 views

0 shares

0 downloads

0 comments

6 / 11

  • 6.

    Local Economic Development

  • 7.

    Municipal Institutional / financial capacity

  • 8.

    Housing and ;

  • 9.

    Waste management, inclusive of solid waste and cemetries

PHASE 4: INTEGRATION

The major output for phase 4 would be on operational strategy which includes:-

  • Final project proposals / designs

  • An Integrated Spatial Development Framework

  • Five year Action Programme

  • Integrated poverty reduction / Gender Equity programme

  • Integrated Environmental Programme

  • Integrated Local Economic Development Programme

  • Integrated HIV/AIDS Programme

  • Integrated Institutional Programme

  • A Disaster Management Plan

  • Integrated Monitoring & Performance Management System

DEVELOPMENTAL OBJECTIVES

The following objectives have been reviewed and re-formulated with a view to achieving the developmental goals of the municipality , the retrospective realization being that it would not be possible to achieve even backlog eradication within the 5 year lifespan of the IDP.The objectives , however, remain linked to the legal imperatives and minimum standards even though the extremely limited resource base impedes the achievement of goals.

Water & Sanitation

Reduce backlogs from an estimated 42% ( 25 800 households) by 5%( 2 500 households )per annum towards compliance with legal requirement and minimum RDP standards.

Document info
Document views24
Page views24
Page last viewedTue Dec 06 20:24:47 UTC 2016
Pages11
Paragraphs241
Words1674

Comments