X hits on this document

PDF document

JSC Negotiates with A-V Corporation for Audiovisual Public Information - page 44 / 146

336 views

0 shares

0 downloads

0 comments

44 / 146

Page 2

initial test flights now scheduled for the spring of 1979. Enterprise was used in the successfulapproachand landing test project during

which time it was released from the 747 carrier aircraftfor a piloted

landing at EdwardsAir Force Base. These tests were completed in October.

The Shuttl_ nrhitpr will hp u_d at lpnst lnN tim_s Hu_in9 the Shuttle program. It will be boosted into low earth orbit by means;of

its three main engines, coupled with the two solid rocket boosters;

which are strapped to the side of the externalfuel tank. The boosters,

like the Orbiter,will be reused.

When the vibration tests are concludedat the Marshall Space

Flight Cntr,

Enterprisewill be

returnedto Californiawhere it is

scheduledfor major modifications. The first space flights of Shuttle

will be with a second orbiter now being assembled at the Rockwell

InternationalSpace Division plant at Palmdale,California.

###

NASA-JSC

Document info
Document views336
Page views336
Page last viewedFri Dec 02 18:09:06 UTC 2016
Pages146
Paragraphs5669
Words22291

Comments