X hits on this document

PDF document

JSC Negotiates with A-V Corporation for Audiovisual Public Information - page 82 / 146

405 views

0 shares

0 downloads

0 comments

82 / 146

7

The next step is to maintain the Skylab in good health until

early 1980 so the development and testing of the space shuttle

can be completed and work on the teleoperator retrieval system can

be

completed.

Present

options

include

either

a

reboost

to

a

higher

altitude or a deliberate deboost over an unoccupied portion of the

Earth's

oceans.

Both

options

would

use

the

teleoperator

system

which

would

be

carried

up

and

recovered

by

Shuttle.

A

space

shuttle

crew would fly up to the Skylab and the teleoperator would then be

remotely flown and docked with the Skylab to perform this reboost

deboost mission.

###

Document info
Document views405
Page views405
Page last viewedThu Dec 08 06:16:58 UTC 2016
Pages146
Paragraphs5669
Words22291

Comments