MARCH 21, 2005SHAWNEE PLANNING COMMISSION MINUTESPAGE 28

disturbed areas, an installation schedule, details of any special grading activities, and standards details of all proposed measures.

16.Erosion and sediment control measures are required for all land disturbing activities.  The applicant is responsible for installing all such measures shown on the approved plans prior to commencing any grading activities.  The applicant is also responsible for maintaining such measures throughout construction until vegetation is established over the disturbed areas.  Staff may require additional measures as may be necessary in the field to repair eroded areas and retain sediment on the development site.  The applicant is responsible for installing such additional measures or repairing existing measures within 72 hours of receiving notification.  All disturbed areas must be covered with sod, or seed and mulch, immediately following the completion of final site grading.  All temporary measures must be removed once vegetation is established over the disturbed areas.

17.The applicant is responsible for obtaining such permits as may be required by the Army Corps of Engineers (COE) for grading activities covered by Section 402 (Wetlands) and Section 404 (Waters of the United States) of the Clean Water Act.

18.The applicant is responsible for obtaining such permits as may be required by the Kansas Department of Health and Environment (KDHE) for grading activities covered by the Environmental Protection Agency’s National Pollutant Discharge Elimination System Permit Program.  A copy of the application for any required permit must be submitted to the City prior to the issuance of any grading permit.

19.Sidewalks were not required in non-residential subdivisions when Perimeter Park was approved.  Therefore, the applicant is not required to install sidewalks along Cole Parkway or 83rd Terrace.  However, the applicant and/or developer of Perimeter Park, 10th Plat is responsible for installing a sidewalk along the south side of 83rd Street.  The sidewalk shall be placed one-foot inside the right-of-way with a sidewalk ramp installed to ADA standards at the intersection.

20.

All utilities shall be placed underground.

21.The applicant is responsible for scheduling a pre-design meeting with Engineering staff prior to preparing the final site development plans, which must show all proposed public and private site improvements.  The public improvements required for this development should be limited to grading within the public street right-of-way and connecting the private storm sewer to the public system.  As previously discussed, the commercial driveway approaches will be constructed as part of the required street improvements.  These public improvements shall be designed according to the standards in the Shawnee Manual of Technical Specifications and Design Criteria.  The final site development plans must be submitted to the City for review and approval of the