MARCH 21, 2005SHAWNEE PLANNING COMMISSION MINUTESPAGE 8

11.Access control is required along all lot lines adjoining Carson Street to prevent direct vehicular access to this major street.  Access control has been provided on the plat as required;

12.The applicant is responsible for paying for City-installed street name signs prior to the issuance of a Public Improvement Permit for constructing the streets;

13.The public street lighting system required for this development shall be designed in accordance with Division 4800, Street Lighting, of the Shawnee Manual of Technical Specifications and Design Criteria, and as identified in the staff report;

14.The stormwater drainage system required for this development shall be designed in accordance with Division 4600, Storm Drainage of the Shawnee Manual of Technical Specifications and Design Criteria, and as identified in the staff report;

15.This development is subject to the provisions of Shawnee Municipal Code (SMC) Chapter 12.24, which pertains to the construction and maintenance of on-site stormwater detention facilities.  The detention facility required for this development will be designed in accordance with Division 4600, Storm Drainage of the Shawnee Manual of Technical Specifications and Design Criteria, and as identified in the staff report;

16.Telephone, electric and cable service facilities are to be placed within rear and side yards as required by Policy Statement PS-24.  All utilities shall be placed underground;

17.The site grading, and erosion and sediment control measures required for this development shall be designed according to the standards in the Shawnee Manual of Technical Specifications and Design Criteria, and as identified in the staff report;

18.The applicant is responsible for submitting a rough grading, and an erosion and sediment control plan with the street and storm drainage improvement plans;

19.Erosion and sediment control measures shall be installed and maintained, as identified in the staff report, until all construction is complete;

20.The applicant/homebuilder is responsible for submitting a Category II Plot Plan to the City in accordance with the “lot-to-lot” grading standards for each lot in the residential development prior to the issuance of any type of building permit;

21.The applicant is responsible for obtaining all such permits as may be required by all Federal, State, and Local agencies, including but not limited to the Kansas Department of Health and Environment (KDHE), Kansas Division of Water Resources (DWR), and U.S. Army Corps of Engineers (COE);

Document info