X hits on this document

PDF document

Content of Selected Publications to Thrust Areas: - page 10 / 12

25 views

0 shares

0 downloads

0 comments

10 / 12

Selected Technology Thrust Publications

Browne, C., Rauch, A., Haas, C., and Kim, H. (2002). “Performance Evaluation of Automated Machines for Measuring Gradation of Aggregate,” accepted by ASTM in September.

Cho, Y., Haas, C., Liapi, K., and Sreenivasan, S. (2002). “A framework for rapid local area modeling for construction automation.” Journal of Automation in Construction, 11(6), pp. 629-641.

Cho, Y., Haas, C., et al. (2002). “Error Analysis and Correction for Large Scale Manipulators in Construction,” ASCE Journal of Construction Engineering and Management.

Cho, Y.K., and Haas C.T. (2003). “Rapid Geometric Modeling for Unstructured Construction Workspaces,” Journal of Computer-Aided Civil and Infrastructure Engineering, 18:4.

Davis-Blake, A., Gibson, G. E., Dickson, K. E., and Mentel, B. (2001). "Workforce Demographics Among Engineering Professionals, A Crisis Ahead," Report #21, Center for the Construction Industry Studies, The University of Texas at Austin, 45 pp., October.

Davis-Blake, A. and Broschak, J. (2000). Speed Bumps or Stepping Stones: The Effects of Labor Market Intermediaries on Relational Wealth. In C. Leana and D. Rousseau (Eds.), Relational Wealth: A New Model for Employment in the 21st Century, Oxford University Press, pp 91-115.

Goodrum, P., and Haas, C. (2002). “The Long Term Impact of Equipment Technology on Labor Productivity in the U.S. Construction Industry at the Activity Level,” ASCE Journal of Construction Engineering and Management.

Goodrum, P., and Haas, C. (2002). “Partial Factor Productivity and Equipment Technology Change at the Activity Level in the U.S. Construction Industry,” ASCE Journal of Construction Engineering and Management, Vol. 128, no.6, pp 463-472, Nov/Dec.

Haas, C.T., O’Connor, J.T., Borcherding, J.D., Glover, R.W., Tucker, R.L., and Eickmann, J.A. (2000). “Prefabrication and Preassembly Trends and Effects on the Construction Workforce,” Center for Construction Industry Studies, Report No. 10, Univ. of Texas at Austin.

Haas, C.T., Borcherding, J.D., Glover, R.W., Tucker, R.L., and Alemany, C. (2000). “The Effects of Computers on Construction Foremen,” Center for Construction Industry Studies, Report No. 9, Univ. of Texas at Austin.

Haas, C. T., O'Connor, J. T., Tucker, R. L., Eickmann, J. A., and Fagerlund, W. (2000). Prefabrication and Preassembly Trends and Effects on the Construction Workforce, Report to the Center for Construction Industry Studies, Report No. 14, University of Texas at Austin, September.

Khoury, J., Haas, C., and Mahmassani, H. (2002). “Performance Comparison of Automated Vehicle Identification and Inductive Loop Traffic Detectors for Incident Detection,” ASCE Journal of Transportation.

Kim, Y., and Haas, C. (2002). “Automation in Infrastructure Construction,” Construction Innovation, Vol. 2, Issue 3.

Kim, Y.S., and Haas, C. (2000). “A Model for Automation of Infrastructure Maintenance using Representational Forms,” Vol. 10/1, Automation in Construction, pp. 57-68, Sept.

Kim, H., Haas, C., Rauch, A., and Browne, C. (2001). “Wavelet Based 3D Descriptors of Aggregate Particles,” National Research Council’s Transportation Research Board’s Transportation Research Record.

10

Document info
Document views25
Page views25
Page last viewedSun Dec 04 19:06:13 UTC 2016
Pages12
Paragraphs150
Words3960

Comments