X hits on this document

PDF document

Content of Selected Publications to Thrust Areas: - page 5 / 12

30 views

0 shares

0 downloads

0 comments

5 / 12

O’Connor, J. T. (2002). Planning the Startup of the Hamaca Crude Upgrader Project: Status and Path Forward, report to Petrolera Ameriven, Puerto La Cruz, Venezuela, January.

O’Connor, J. T. and Hubers, M. J. (2002). Systems Integration Standards Development Efforts for Facilities Engineering and Construction, Report to the Center for Construction Industry Studies, Report No. 24, University of Texas at Austin, April.

O’Connor, J. T. and Qiu, H. (2002). Proposals for the Transition of I-635/US 75 Interchange and I-635 HOV/T Projects, Dallas, Texas, Report to Dallas District, Texas Department of Transportation, Center for Transportation Research, University of Texas at Austin, April.

O’Connor, J. T. and Delao, M. R. (2002). Contracting and Construction Issues for the Port Isabel Service Processing Center Project, Report to the Center for Construction Industry Studies, Report No. 26, University of Texas at Austin, July.

O’Connor, J. T. and Syed, U. (2001). Planning for the IH 635 HOV/Toll Tunnels, Dallas, Texas, A report to the Texas Department of Transportation, Dallas District, Center for Transportation Research, Austin, TX, July.

O’Connor, J. T. and El-Diraby, T. E. (2000). “Urban Freeway Bridge Reconstruction Planning: the Case of Mockingbird Bridge,” Journal of Construction Engineering and Management, ASCE, Jan./Feb., pp. 61-67.

O’Connor, J. T. and Dodd, S. C. (1999). Capital Facility Delivery with Enterprise Resource Planning Systems, Center for Construction Studies Report No. 8, University of Texas at Austin, June.

Thomas, S.R., Tucker, R.L., and Kelly, W.R. (1998). “Critical Communication Variables,” Journal of Construction Engineering and Management, ASCE, Jan/Feb., pp. 58-66.

Vines, E., Gibson, G., Walewski, J. et al. (2003). “International Project Risk Assessment (IPRA) Tool.” Construction Industry Institute Implementation Resource 181-2. The University of Texas at Austin.

Walewski, J., Gibson, G., and Vines, E. (Forthcoming 2005). “Risk Identification and Assessment for International Construction Projects.” Chapter for inclusion in the 2nd Edition of the Global Project Management Handbook being developed for McGraw-Hill, Inc., New York, NY, by David I. Cleland and Roland Gareis.

Walewski, J., Gibson, G., Jackson, Y., and Vines, E. (2004). “Risk Assessment on International Projects: A Management Approach.” Proceedings of 2004 PMI Research Conference, July 2004, London.

Walewski, J., Gibson, G., and Dudley, G. (2003). "Risk Assessment for International Construction," Research Report to the Construction Industry Institute, Research Report 181-11. The University of Texas at Austin.

Walewski, J. and Gibson, G. E. (2003). "International Project Risk Assessment: Methods, Procedures, and Critical Factors," Center for Construction Industry Studies, Report # 31, The University of Texas at Austin.

Walewski, J., Gibson, G. E. and Vines, E. (2002). "Improving International Capital Risk Analysis and Management," Proceedings of the Project Management Institute Research Conference 2002, Seattle, WA, pp. 493-501, July.

Walewski, J., Gibson, G. E. and Jasper, J. (2001). “Project Delivery Methods and Contracting Approaches Available for Implementation by the Texas Department of Transportation,” Research Report Number 2129- 1, Center for Transportation Research, 68 pp., October.

Wang, Y. R. and Gibson, G. E. (2002). "Using PDRI for Project Risk Analysis," Proceedings of the Project Management Institute Research Conference 2002, Seattle, WA, pp. 503-510, July.

5

Document info
Document views30
Page views30
Page last viewedSat Dec 10 12:53:38 UTC 2016
Pages12
Paragraphs150
Words3960

Comments