X hits on this document





78 / 141

the building hereby permitted shall not give rise to a noise level, assessed with the windows open, within any dwelling or noise sensitive buildings in excess of that equivalent to Noise Rating Curve 35 between the hours of 7:OO a.m. and 1O:OO p.m. and Noise Rating Curve 25 at all other times.

To safeguard the amenity of the adjoining residential area.


That before the development hereby permitted starts, full details of the noise mitigation measures s h a l l b e s u b m i t t e d f o r t h e w r i t t e n a p p r o v a l o f t h e P l a n n i n g A u t h o r i t y , a n d t h e s e s h a l l i n c l u d e : Detailed calculations of a 5 metre barrier within the service yard to protect the residential a)

amenity of 96-106 Miller Street, and a protect the amenity of 79 Quarry Street.

metre screen to the north east of the site to


details of the faqade levels for the upper floor windows of 96-106 Miller Street to confirm that the noise levels predicted are with the 5 metre barrier in place;

To safeguard the residential amenity of the surrounding residents.


T h a t b e f o r e t h e d e v e l o p m e n t h e r e b p e r m i t t e d i s b r o u g h t i n t o u s e a l l o f t h e n o i s e m i t i g a t i o n m e a s u r e s w i t h i n t h e r e p o r t d a t e d 2 6 A u g u s t 2 0 0 5 b y S h a r p s R e d m o r e P a r t n e r s h i p , a p p r o v e d y h under the terms of Condition 16 above, shall be certified by a suitably qualified person as having been completed.

In order to protect the amenity of surrounding residents.


That deliveries to the site shall be restricted to 0800 to 2200 daily and the use of compactors in the service area shall be restricted to between 0800 and 2200 hours Monday to Saturday only, unless otherwise agreed in writing by the PlanningAuthority.

In order to limit the impact of the development.

That before the development hereby permitted starts, a scheme of lighting shall be submitted for the written approval of the PlanningAuthority and it shall include:-

, details of the design and location of all lighting within the petrol filling station

a) b)

details of the design and location of all utility lighting to be positioned within the parking and servicing areas


a scheme of lighting for the pedestrian routes traversing the site and to the site from Main Street


a scheme of amenity lighting for the retail building


To enable the PlanningAuthority to consider these aspects in detail.


That before the buildings hereby permitted are brought into use, the scheme approved under the terms of Condition 19 shall be implemented and thereafter all lighting shall be maintained and operated in accordance with the provisions of the scheme, except as may otherwise be agreed in writing by the Planning Authority.

In the interest of the visual amenity of the site and surrounding areas, to protect adjacent residences from high levels of light pollution and in the interest of pedestrian safety and security within and on the route to the site.


That before the development starts, full details of the location and design of the drainage scheme to be installed shall be submitted to the Planning Authority for written approval, and these shall include full details of the location and design of the surface water drainage scheme, and for the avoidance of doubt the scheme shall comply with the Scottish Environment Protection Agency's

Document info
Document views249
Page views249
Page last viewedFri Oct 21 22:18:20 UTC 2016