16 / 25

12

Completion Year

Completed December 2006

GRIP stage

8

Funding

Network Rail

Main asset type(s)

Structures

Infrastructure investment

The following table highlights schemes that are planned for completion in the financial year shown:

Figure 17 Planned infrastructure investment

Output change

Project description

Project

Renewal

Strengthening works

East Largin viaduct (12.04)

A

Network Rail Route Plans 2007

2007/08

Network Rail

Track

Renewal

Plain line renewals at Hungerford, Newton Abbot, Starcross, Exeter St James’ Park, Polsloe Bridge and Collegewood

Track Renewals (12.01, 12.03, 12.05, 12.10 & 12.11)

B

2007/08

Network Rail

Track

Renewal

S&C renewals at Bedwyn, Liskeard East and Penwithers

Track Renewals (12.01 & 12.04)

B

2007/08

4

Network Rail

Telecoms

Renewal

SPT concentrator renewal

Westbury PSB (12.01)

C

2007/08

2

Network Rail

Earthworks

Renewal

Stabilisation works

Long Sutton cutting (12.01)

D

2007/08

4

Network Rail

Telecoms

Renewal

SPT concentrator renewal

Exeter PSB (12.03)

E

2007/08

5/6

Network Rail

Structures

Renewal

Sea defences preventative maintenance

Dawlish sea wall (12.03)

F

2007/08

3

Network Rail

Earthworks

Renewal

Stabilisation works

Wear Farm cutting (12.03)

G

Deferred

2

First Great Western

Property

Renewal

Wheel lathe renewal

Laira LMD (12.03)

H

2007/08

3

Network Rail

Structures

Renewal

Strengthening works

Weston Mill viaduct (12.04)

H

2007-09

2

Network Rail

Structures

Renewal

Preventative maintenance

Royal Albert bridge (12.04)

H

2007/08

3

Network Rail

Structures

Renewal

Strengthening works

St Pinnock viaduct (12.04)

A