14

Completion Year

2009/10

2009/10

GRIP stage

4

2

Funding

Network Rail

Network Rail

Main asset type(s)

Property

Track

Output change

Renewal

Renewal and linespeed increase onto the Falmouth branch

Figure 17 Planned infrastructure investment

Project description

Project

Building works

Laira LMD (12.03)

H

S&C renewal

Truro (12.04)

L

Network Rail Route Plans 2007

2009/10

2

Network Rail

Structures

Renewal

Strengthening works

Hayle viaduct (12.04)

M

Figure 18 highlights other schemes under consideration.

Figure 18 Infrastructure investment under consideration

Status

Funding

Main asset type(s)

Output change

Project description

Project

No longer under consideration following a structural condition report that concluded that the viaduct would be unsuitable for conversion to two- track operation.

n/a

Structures

Improved capacity and performance

Reinstate double track

St Pinnock viaduct (12.04)

A

No longer under consideration following a structural condition report that concluded that the viaduct would be unsuitable for conversion to two- track operation.

n/a

Structures

Improved capacity and performance

Reinstate double track

East Largin viaduct (12.04)

A

Pre-GRIP

Third party and Network Rail

Stations

Improved station facilities at Torre, Torquay and Paignton

Station enhancements

Torbay stations (12.06)

N