X hits on this document

PDF document

AN INTRODUCTION TO - page 46 / 72

292 views

0 shares

0 downloads

0 comments

46 / 72

5. Conclusion:

The Absolute Block System of working was studied initially by traveling upto Surat for getting a first hand knowledge. The study for Automatic Block system was done next.

The R.R.I. (Route Relay Interlocking) principle and various signaling concepts were studied. The project develops a simulation model for the RRI panel of Mira road. It takes all the precautions which are actually taken up by the Railways to provide a Fail Safe system of working.

The project is built on the basics of R.R.I. and Automatic Block System. This project can be used as a trainer kit for anyone who is interested in understanding this complex yet very interesting system of management.

During the course of this project hand-on experience about the working of different systems for managing trains in Indian Railways was gained. It makes one realize the complexities involved in running the “Life line “of Mumbai.

46

Document info
Document views292
Page views292
Page last viewedTue Jan 24 02:55:30 UTC 2017
Pages72
Paragraphs776
Words11166

Comments