X hits on this document

PDF document

Words in the singular include the plural; and - page 23 / 133

260 views

0 shares

0 downloads

0 comments

23 / 133

SOLID WASTE PROCESSING AND DISPOSAL

CHAPTER 1200-01-07

(Rule 1200-01-07-.02, continued)

  • (II)

    The operator attaches to his notification all attachments required at rule 1200-01-07-.10(2)(b)1; and

  • (III)

    The facility is designed and operated in compliance with rule 1200- 01-07-.10.

  • (v)

    A transfer station, if:

    • (I)

      The operator complies with the notification requirements of Part 2 of this subparagraph; and

    • (II)

      The facility is constructed, operated, maintained, and closed in a manner consistent with items II, III, IV, V, VI,VII,VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, XVIII, XIX, XX, XXI, and XXIV of rule 1200-01-07- .02(1)(c)1(i).

  • (vi)

    A land application facility, if:

  • (I)

    The operator complies with the notification requirements of Part 2 of this subparagraph;

  • (II)

    The operator attaches to his notification all attachments required at rule 1200-01-07-.13 (1)(c); and

(III)

The facility is designed and operated in compliance with rule 1200- 01-07-.13.

  • 2.

    The operator of a facility deemed to have a permit by rule must notify the Department in accordance with the requirements of this part.

    • (i)

      No person shall begin operation on a new facility without having submitted notification and received written approval from the Commissioner.

  • (ii)

    Notification must be submitted on forms provided by the Department and completed as per the accompanying instructions. It must include, but shall not necessarily be limited to, the following information:

    • (I)

      The processing and disposal activities conducted and the types of

solid wastes handled;

(II)

The name, mailing address, and location of the facility;

(III)

The name, mailing address, and telephone number of the applicant and, if the applicant is a government agency, corporation, company, or partnership, that of the process agent or other contact person;

(IV)

If different from the operator, the name, mailing address, and telephone number of the landowner, along with a signed letter from such owner to the Department allowing access to the property for purposes of inspection;

(V)

A map (e.g., U.S.G.S. 7.5 minute topographic map) which clearly indicates the location of the facility;

(VI)

A written narrative must be submitted that describes how the facility/operation will comply with all applicable standards listed in

May, 2010 (Revised)

23

Document info
Document views260
Page views260
Page last viewedWed Nov 30 01:08:33 UTC 2016
Pages133
Paragraphs5694
Words55007

Comments