Typical plant layout for single-unit gas turbine package

87 m

60 m 43 m

6a

5

6b

5

30 m

3a

7

3b

2c

2a

2d

1

2b

8

4a

9a

4b

= options (Gas turbine package layout for a typical 2x1 multi-shaft arrangement)

Plant Arrangement Diagram

Plant arrangements and systems configuration are illustrated in the chart above.

9b

1

Gas Turbine

2a

Auxiliary Systems Module for Fuel Gas,

Hydraulic Oil, Instrument Air, Lube Oil 2b Auxiliary Systems Module for Fuel Oil,

Purge Water, NOX Water 2c Compressor Cleaning Skid 2d Compressor Dehumidifier Skid 3a Air Intake Filter House

(envelope is shown schematically) 3b Air Intake Duct 4a Exhaust Gas Diffuser 4b Stack or Bypass Stack with Diverter Damper

5

6

Power Control Center with Electrical and I&C Equipment a Low Voltage Transformer for

9b

Static Excitation Equipment 6b Low Voltage Transformer for

Starting Frequency Converter

7

Electrical Generator

8

CO2 Fire Protection

9

a Lube Oil Fin-Fan Cooler

9b Generator Fin-Fan Cooler

Siemens Gas Turbine Package SGT5-PAC 4000F in a multi-shaft combined cycle power plant