X hits on this document

PDF document

FAA-STC/PMA Approved - page 13 / 27

122 views

0 shares

0 downloads

0 comments

13 / 27

PXE7300 Series IFE System Installation and Operator’s Manual

  • 13.

    Repeat step 10 for COM 2, and other transmitters.

    • a.

      Tune Nav 1 to local station and perform a standard VOT test in accordance with 14 CFR 91.171.

    • b.

      Note the indicated VOR bearing on both systems.

    • c.

      Turn the PXE7300 on and off, and observe any change in the VOR indication that could be attrib- uted to the PXE7300.

Verify that the wiring is bundled away from all controls and no part of the installation interferes with air- craft control operation. Move all controls through their full range while examining the installation to see that no mechanical interference exists. Verify that the cables are secured to the aircraft structure in accor- dance with good practices, with adequate strain relief. Ensure that there are no kinks or sharp bends in the cables and coaxial cables. Verify that the cables are not exposed to any sharp edges or rough surfaces, and that all contact points are protected from abrasion.

Complete logbook entry, FAA Form 337, weight and balance computation and other documentation as required. Sample text for FAA Form 337 and instructions for continuing airworthiness can be found in Appendix F.

Return completed warranty registration application to PS Engineering.

200-973-0002

Page 2-7

April 2006

Document info
Document views122
Page views122
Page last viewedSat Jan 21 14:09:41 UTC 2017
Pages27
Paragraphs913
Words6927

Comments