FN038-4 (Rev. 8/00)

  • 17.

    Project sign locations (one at each end of project).

  • 18.

    Site Security: Contractor to provide own security. SAWS not responsible.

  • 19.

    Utilities:

    • a.

      Water not billable, but must get backflow devices / meters from Meter Shop.

    • b.

      Electrical, phone, etc. at Contractor’s expense.

  • 20.

    Sanitary facilities are not available at the construction site. Temporary sanitary facilities to be provided by Contractor at no extra cost to SAWS.

  • 21.

    Hazardous material: This project DOES / DOES NOT work with hazardous materials or processes. Contractor personnel must be fully qualified prior to work.

  • 22.

    Inspection procedures:

a. b. c. d. e. f.

Compaction Testing by: Concrete Testing: Utility Acceptance by: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Painting by: Electrical by: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Other tests not specifically noted in contract but requested by SAWS Inspections are to be paid by the contractor, then invoiced plus 10%.

  • 23.

    Utility Outages:

    • a.

      Any work affecting existing SAWS production and / or treatment facilities shall be coordinated with the Inspector and the facility manager.

    • b.

      Contractor to notify all residents, businesses, etc. minimum 24 hours prior to shutoff.

  • 24.

    Traffic Control special requirements:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

25. Utility special requirements:

CPS (Elect / gas): ___________________________________________________________ SW Bell (Phone): ___________________________________________________________ Timer Warner (Cable TV): ____________________________________________________ Other:_____________________________________________________________________

Other:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

26. Payment Requests and Material Stored On-site: Submit by 30th of each month:

  • a.

    Monthly invoices to be submitted in accordance with examples in Construction Phase Procedures Guidance.

  • b.

    Submit draft “scratch sheet” to Contract Administration for review and approval within 2 weeks of NTP.

  • c.

    Prepare 6 sets of monthly invoices.

  • d.

    Obtain signature(s) of contractor and consultant (as appropriate) before sending to SAWS Construction Inspection.