X hits on this document

PDF document

A Gentle Introduction to Enterprise Guide® 3.0 - page 6 / 8

19 views

0 shares

0 downloads

0 comments

6 / 8

During the Hands on Workshop, we will look at ways to modify this report.

CREATING A BAR CHART

In the Process Flow /Project window, make sure the Products table is selected (activated). Next, from the Menu bar, select Graph, then choose Bar Chart. ( You can also open the Bar chart task window by double – clicking on Bar in the Task window). When the Bar Chart for PRODUCT window opens, select Simple Vertical Bar.

figure 9. The Bar Chart Task window.

As soon as this selection is made, the Task Roles window opens. Next, drag the variable Category and drop it on Columns to Chart. Then, drag Unit_Price and drop it on Sum of.

figure 10. The Completed Task Roles window for the Bar Chart.

Once this window is completed, click on the Run button.

6

Document info
Document views19
Page views19
Page last viewedFri Oct 28 14:20:30 UTC 2016
Pages8
Paragraphs116
Words1676

Comments