VI.

PROGRAM LOGISTICS

A.

MANPOWER & PERSONNEL

Prior to the MRAP program establishment in December 2006, only three personnel within MARCORSYSCOM were assigned to oversee the limited amount of

MRAP vehicles that had manager, the contracting designation of the MRAP

been previously procured.

These three were the program

officer,

and

an

administrative

assistant.

Following

the

requests as a JUONS,

an Integrated Product Team (IPT) was

formed to draft vehicles rapidly.

a RFP to solicit As the program

manufacturers who could started to gain momentum,

produce and deliver these there was still little growth

in

personnel

numbers

up

until

July

2007.

Up

until

this

point,

there

was

a

two

pronged

approach to program expansion. The Army set up its own program office for the vehicle with eight to ten personnel from TACOM whose purpose was to focus on

MRAP MRAP

issues and participate on IPTs. At the same time, the Marine Corps 25 personnel that included logisticians, contract specialists, and Some of these personnel were also well experienced in program and

established a staff of financial managers. project management.

Additionally,

about

60

contracted

personnel

provided

support

services.

In

total,

until

July

2007, less than 100 personnel worked on the MRAP program29 communication, October 15, 2008).

(D. Hansen, personal

During this time, nine different manufacturers received contracts for the production of MRAP vehicles, seven of which eventually delivered prototype vehicles for testing. These manufacturers were IMG, FPII, BAE, AH, OTC, PVI, and GDLS. The program office had one individual overseeing each of the three categories of these

vehicles, as well as the manufacturers offering vehicles within that individuals directly involved with the program, this meant long working

category. For hours, working

29 This does not include the approximate 250 previously mentioned personnel on theT&E team at

Aberdeen Proving Ground.