STARBUCK POWER PROJECT APPLICATION FOR SITE CERTIFICATION

June 29, 2001 June 29, 2001 July 3, 2001 July 9, 2001 July 10, 2001 July 11, 2001 July 19, 2001 July 27, 2001 July 27, 2001 July 27, 2001 July 27, 2001 July 27, 2001 July 27, 2001 July 27, 2001 July 30, 2001 July 30, 2001

Starbuck Stack Height IES Reference Document Info Needed From B&V, Part I Info Needed From B&V, Part II Info Needed From B&V, Part I Access Roads Ammonia Tank Sizing Starbuck Answer du Jour FW: Stormwater Pond Water Use During Construction Water Use During Construction (2) Starbuck—Seismic Design Percolation Pond Review Starbuck Starbuck (2)

August 2, 2001 August 2, 2001 August 2, 2001 August 3, 2001

Chemical Sump Stormwater Stormwater (2) Project x & y 2 by 2x (EPC cost)

Phelps, Brad. Water Resources Engineer, CH2M HILL. Spokane, Washington.

June 15, 2001

Length of Pipe

Smith, Phil. Environmental Coordinator, Bonneville Power Administration. Portland,

Oregon.

April 30, 2001

Starbuck

June 5, 2001

Tower Dimensions

June 11, 2001

Starbuck—Transmission Line

June 18, 2001

Right-of-Way

July 10, 2001

Tower Diagram

Staeger, Bill. Project Manager, Jones & Stokes. Bellevue, Washington.

October 23, 2000 March 23, 2001

Information Needs Answers

May 15, 2001 May 24, 2001 May 24, 2001 June 8, 2001 June 8, 2001

Non-EFSEC Jurisdiction Materials Lighting Design Another One Terminology Discharge Issues

Thomas, Elizabeth. Legal Counsel, Preston, Gates and Ellis. Seattle, Washington.

May 30, 2001 June 7, 2001 July 5, 2001 July 23, 2001

Stormwater Application ASC on Stormwater and Wastewater Cover Letter Application NOI