X hits on this document

Powerpoint document

Testing and Deployment of the Water Vapor Sensing System II - page 8 / 15

60 views

0 shares

0 downloads

0 comments

8 / 15

Presentation Title

Modified enclosure for improved assembly and testing

Infant burn in of all units (laser and SEB)

Factory Testing and Calibration Protocols

Extensive SSI internal testing.

Functional

Pressure/Temperature cycling

Purge and leak testing

Heater system testing

Calibration (Pressure and Temperature)

Post Installation testing

Breakout box

Long term testing (2 units – 1 year to 18 months)

Will test 100% of the units.

Document info
Document views60
Page views60
Page last viewedSun Jan 22 16:35:31 UTC 2017
Pages15
Paragraphs252
Words1237

Comments