X hits on this document

18 views

0 shares

0 downloads

0 comments

6 / 8

CHART Final Design Report

2.1.1.3  Technical Presentations

CHART technical presentations attended and/or reviewed for this study to derive CHART communications requirements included but was not limited to the following:

CHART Design Presentation

2.1.1.4  Related Study Reports

Study reports related to or containing CHART design information reviewed for this study to derive CHART communications requirements included but was not limited to the following:

I-95 Corridor Coalition Project #3 Final Project Report

Interstate ITS information exchange planning

State of Maryland Telecommunications Network Study, June 1995

Statewide network connectivity recommendations

Maryland State Highway Administration Enterprise-Wide Network Study Report, July 1995

SHA enterprise data traffic loading

SHA enterprise connectivity

Draft CHART Strategic Plan, July 1995

Draft CHART Cost Model: Network Costs - Construction, April 1996

Baseline unit cost for CHART backbone hardwire cable plant installation

S2_1.DOC2-611/29/96

Document info
Document views18
Page views18
Page last viewedWed Dec 07 12:45:31 UTC 2016
Pages8
Paragraphs133
Words2377

Comments