REQUEST FOR PROPOSAL

Table 1. Schedule of Air Monitoring Sites, Locations and Major Instrumentation

Oak Park Recreation Center

Yes

Grain Elevator @ Port of Corpus Christi J. I. Hailey Site @ Port of Corpus Christi TCEQ Monitoring Site C199 @ Dona Park Port of Corpus Christi building on west end of CC Inner Harbor Off Up River Road on Flint Hills Resources easement Solar Estates Park at end of Sunshine Road

Yes

Auto GC

Description of Site Location

Longitude

  • 1.

    a

  • 1.

    b

  • 1.

    c

  • 1.

    d

  • 1.

    e

  • 1.

    f

  • 1.

    g

    • 27.79861

      º 97.43394º North West

    • 27.81837

      º 97.42130º North West

    • 27.82485

      º 97.43227º North West

    • 27.81165

      º 97.46561º North West

    • 27.84418

      º 97.52525º North West

    • 27.82769

      º 97.52952º North West

    • 27.82906

      º 97.54322º

North

West

Site Contract Reference

Latitude

Event

Sulphur

Triggered

Compound

Samplers

Monitors

Major Monitoring Equipment/Systems

Yes

Meteorology Station

Yes

Surveillance Camera

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

With the exception of the meteorology and air quality sensors and the surveillance cameras, all of the instrumentation at each site will be housed inside an 8 ft by 16 ft climate controlled EKTO shelter modified for the specific air monitoring and support equipment specified in Table 1. These shelters have a special compartment attached to the exterior of the trailer for flammable gas storage. With the exception of the Perkin-Elmer Auto GC, the following equipment will be rack mounted, where specified for a site in Table 1.

  • TECO Model 43C SO2 Analyzer

  • TECO Model 45C H2S Analyzer

  • TECO Model 55C NMHC Analyzer

  • ENTECH Model 1800 VOC Sampler

  • Tanabyte Model 300 Dynamic Dilution Calibrator

  • API Model 701 Clean Air Supply

  • ZENO Model 3200 Data Acquisition System

The Auto GCs will be located on a separate table. The meteorology sensors will be mounted on a telescoping 33 ft aluminum tower at the end of the trailer. The surveillance cameras, Panasonic Model WV-CW 864 systems, will be mounted on either the meteorology tower or an alternate location in close proximity to the trailer. The camera systems include a digital disk recorder and multiplex unit, which will be housed in the EKTO shelter. All data transfer will be via a DSL (static IP address) connection. All software for equipment and any required software licenses will be provided by University with the equipment. Each site has a 40 ft by 40 ft limestone/cement pad and a six foot fence with security top at the perimeter of the site. Smoking is not allowed within the fence line of any site.

It will be the responsibility of the contractor selected, to operate and maintain each site as fully operational in the condition presented to them when they assume operation of the site. All sites and equipment will be complete and fully operational and in compliance with the current revision of the TCEQ NAMS/SLAMS and PAMS QAPPS. Proposers shall be required to maintain compliance with these protocols and shall be required to follow the specific QAPP for each site. It is the proposer’s responsibility to obtain the most current revision of the Texas Commission on Environmental Quality (TCEQ) NAMS/SLAMS and PAMS QAPPS to reference in preparing their proposals. In addition to the minimum requirements specified by the TCEQ NAMS/SLAMS and PAMS QAPPS, the following additional requirements will be imposed:

1.

Auto GC, H2S & SO2: Conduct performance challenges (through the probe tip) annually and after any repair or major maintenance.

REQUEST FOR PROPOSAL Page 10 of 16