X hits on this document

163 views

0 shares

0 downloads

0 comments

16 / 63

REQUEST FOR PROPOSAL

Operation and Maintenance costs of seven sites without Perkin Elmer Auto GC Systems at Sites 1.a and 1.g.

Site 1.a

0.00

Site 1.a (Auto GCs)

Site 1.b

0.00

Site 1.c

0.00

Site 1.d

0.00

Site 1.e

0.00

Site 1.f

0.00

Site 1.g

0.00

Site 1.g (Auto GCs)

Total

0.00

Operation and Maintenance costs of two Perkin Elmer

Operation and Maintenance costs of seven sites including

Auto GC Systems at Sites 1.a Perkin Elmer Auto GC Systems

and 1.g.

at Sites 1.a and 1.g.

OPTION III

0.00

0.00

0.00

0.00

Section 5.5.1. BIDDER:

COST SUMMARY FORM

OPTION I

OPTION II

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

REQUEST FOR PROPOSAL Page 14 of 16

Document info
Document views163
Page views163
Page last viewedSun Dec 11 10:47:20 UTC 2016
Pages63
Paragraphs1594
Words21443

Comments