1.3.9. It shall be a non-negotiable requirement for the Manufacturer to provide support in the form of adequate spare parts and trained service personnel based in a location(s) readily accessible (response time to ASPA not to exceed four (4) hours) to the Alabama State Port Authority, Pinto Terminal, Mobile, Alabama for the Forklift trucks to be furnished under this Contract. Manufacturer to provide full details of the proposed service/support location(s) and support levels provided from these service location(s).

1.4

Responsibility for Loss or Damage to the Forklift trucks and All Components Thereof

The Manufacturer will assume the sole responsibility for any the Forklift trucks and all components thereof, regardless of damage occurs until acceptance (Acceptance Document)

loss or damage to how such loss or

by

ASPA.

The

Manufacturer shall also be responsible for the any damage to existing facilities, including

protection of his equipment and underground facilities, during

for the

assembly of the Forklift trucks. Any damage resulting from shall be properly repaired or replaced to ASPA's satisfaction Manufacturer.

Manufacturer's work at the expense of the

1.5

Use of Contractor's Drawings

The intent of ASPA is to use the Contractor's drawings and manuals for internal operation, maintenance, and upgrading activities.

    • 1.6

      Items Requiring ASPA's Consent

      • 1.6.1.

        The following require ASPA's consent (such consent not to be unreasonably withheld):

        • 1.6.1.1

          Equal or approved equal

        • 1.6.1.2

          Extension of time or price change

        • 1.6.1.3

          Project Schedule

        • 1.6.1.4

          Deviations from the specified concepts, systems or components

proposed by the Manufacturer

        • 1.6.1.5

          Site assembly procedures

        • 1.6.1.6

          Operating instructions, maintenance, repair and inspection manuals

        • 1.6.1.7

          Progress payments

        • 1.6.1.8

          Field test procedure

        • 1.6.1.9

          The use of ASPA's name in any test or advertising

        • 1.6.1.10

          Outline dimension drawing of Forklift truck equipment

        • 1.6.1.11

          Spare parts

Revision 0

1-5