SECTION 10 - DELIVERY

    • 10.1

      Acceptance Tests

      • 10.1.1.

        Upon delivery of the Forklift trucks to the site, it shall be inspected by the Manufacturer's representative for any damage incurred during shipping and for completeness and function of all systems. These inspections shall be conducted in the presence of an ASPA representative. Reports of these inspections are to be submitted to ASPA. Any damage or incompleteness including paint damage shall be repaired.

10.1.2. The Manufacturer shall prepare test procedures for tests to prove the compliance of the Forklift trucks to this specification. The test procedures shall be submitted to ASPA for approval not later than forty-five (45) days prior to scheduled tests. The Manufacturer shall successfully complete the tests at the terminal site and provide reports of these tests to ASPA. An ASPA representative will witness the performance of the tests. All tests and inspections shall be performed by the Manufacturer at no cost to ASPA.

10.1.3. As part of the acceptance test procedures, the Magnet beam supplier shall perform on site commissioning, start-up and testing of the Magnet beam system functioning on the Forklift truck.

10.2

Final Inspection and Punch List

10.2.1. Upon successful completion of the operational tests, an inspection shall be conducted by ASPA's representative. This inspection shall identify any remaining work, missing parts, and defects. The Manufacturer's representative is to accom- pany the ASPA representative during this inspection.

10.2.2.

A punch list will be compiled by the ASPA representative indicating items found

during the inspection. This list will Manufacturer. Final acceptance will not

be be

distributed to both ASPA and considered until all items noted in

the the

punch list have been supplied or corrected to Manufacturer's representative shall verify correction requesting the ASPA representative for a subsequent

ASPA's satisfaction. of all punch list items inspection.

The before

10.3

Certification

The Manufacturer shall perform all actions necessary to obtain certification required by any regulatory bodies in order to place the Forklift trucks in service.