Delivery Date

Dollar(s) or $

Fabrication or Manufacturing Site

Fabrication Schedule or Schedule

Manufacturer

Notice to Proceed

Forklift truck

Routine Maintenance

Terminal Site

Subcontractor

Revision 0

1-2

Refers to the date specified in this Agreement that the Manufacturer will deliver the Forklift trucks completely assembled, tested, in operation and accepted by ASPA at the Site.

Refers to the monetary unit of the United States of America, equal to 100 cents.

Refers to the place(s) at which any major component(s) is fabricated, shop assembled and made ready for packing, loading and delivery for transportation to the Site.

Refers to a network analysis of the Critical Path Method (CPM) type that clearly details

Refers to the designer, manufacturer and/or builder of all components and equipment related to the Forklift trucks.

Refers to a written instrument from ASPA that directs the Manufacturer to proceed with the fabrication of the Forklift truck Specification.

Refers to the steel slab handling equipment required by ASPA.

Refers to the periodic replacement of

Refers to the place where the Forklift trucks shall be tested, adjusted, put into operation, and delivered; the Alabama State Port Authority, Pinto Terminal, Mobile, Alabama, U.S.A.

Refers to any

company

that the

Manufacturer may

engage

to furnish

the field

subassemblies as recommended by the Manufacturer and his subcontractors.

the Manufacturer's plan fo manufacturing, shipping and installation of the Forklift trucks.

r

adjustment,

and

Crane and

its

consumables, inspections

of

minor the