Stages of Construction

The project may be divided into clearly identifiable stages such as: -

  • Site preparation,

  • Foundation,

  • Electrical,

  • Plumbing,

  • Floor slab,

  • Walls parts up to ring beam,

  • Roof,

  • Plastering,

  • Windows,

  • Doors.

Approval for a Building Plan

The Building Board or Land Development Control Authority takes between two (2) weeks to two (2) months to approve a building plan. Sometimes, additional information is required to enable the Board to respond. Failure to follow up on a timely basis may lead to unnecessary delays in the approval process.

The Tendering Process

It is also important to have at least three contractors tendering for the project. This will allow comparison to be made. However, the cheaper contractor is not always the best.

It is absolutely critical to get a comprehensive set of documents from the architect. These are useful when you