X hits on this document

130 views

0 shares

0 downloads

0 comments

38 / 46

  • 51.

    The hazard communication plan is located

    • a.

      at Central Station.

    • b.

      at each station.

    • c.

      in the Chiefs office.

    • d.

      All of the above

  • 52.

    What is the correct ratio for ladder placement away from a building?

    • a.

      1:5

    • b.

      1:4

    • c.

      1:3

    • d.

      1:2

The movement of a ground ladder is directed by the

a.

senior man.

b.

lead person.

c.

butt-man.

d.

pump operator.

53.

54.

Hydrant painting is started in

a. b. c. d .

April. May. June. July .

  • 55.

    A manageable span of control has a range of

    • a.

      1 : 2 thru 1 : 5

    • b.

      1 : 4 thru 1 : 10

    • c.

      1 : 5 thru 1 : 6

    • d.

      1 : 3 thru 1 : 7

  • 56.

    Daily pump checks include all except

    • a.

      water tank level inspection.

    • b.

      primer oil level inspection.

    • c.

      relief valve screen cleaning.

    • d.

      draining the neck of all discharges in winter.

  • 57.

    Double jacket and rubber line fire hose is tested

    • a.

      annually.

    • b.

      following repairs.

    • c.

      when delivered.

    • d.

      all the above.

38

Document info
Document views130
Page views130
Page last viewedWed Dec 07 11:19:37 UTC 2016
Pages46
Paragraphs1333
Words9960

Comments