small or residential project include room name, floor material, base material, wall material, ceiling material, ceiling height, and remark (Figure 55). More sub- items can be added to each surface item when different materials are applied to one of the surfaces. For instance, the wall item may include sub items such as north wall, east wall, south wall, or north wall, when different wall finishes are applied to different walls.

ROOM FINISH SCHEDULE

ROOM NAME FOYER

FLOOR CERAMIC TILE

BASE

WALLS

6" CERAMIC TILE PAINT

CEILING

CEILING HEIGHT REMARKS

PTD. GYP. BD 8'-8"

LIVING ROOM HARDWOOD

4" WOOD

FAMILY ROOM NATURAL CORK 4" RUBBER

WALLPAPER WALLPAPER

PTD. GYP. BD 8'-8" PTD. GYP. BD 8'-8"

COFFERED CEILING

DINING ROOM

Figure 55. A typical interior finish schedule for a residential project

The items for a commercial project include mark (room number), room name, floor material, base material, wall material, ceiling material, ceiling height, and remarks. Each surface item lists all the specific finishes that are planned to be applied in the project. Among these materials, the material that will be used in a specific room is checked. For instance, the floor item may include materials such as carpet1, carpet2, vinyl tile1, and vinyl tile 2 for the project, and the carpet1 may be marked as a floor material for the Room 101 (Figure 56).