X hits on this document

PDF document

Research & Consultancy - page 2 / 6

19 views

0 shares

0 downloads

0 comments

2 / 6

Project Highlights:

  • Presently only Zone 1 is launched which consists of 7 buildings of 15 floors each (see image above)

  • Bookings are currently open only for 2 buildings (Victory & Applause), the developer is planning to launch a third building very soon.

  • The construction is about to start in May, 2009 and the builder proposes to give possession by Dec 2011.

  • Of the 2 buildings launched, there will be 8 flats on each floor. Applause will comprise of 2 & 3 BHK, with six 2 BHK and two 3 BHK on each floor. Victory on the other hand will have six 1 BHK and two 1 ½ BHK on each floor.

  • Total 120 units in each building.

  • Currently schools, hospitals, nursing homes and retail establishments are not present in the vicinity of the site. Nearest school is in Kalyan which would take around 25 minutes by auto. The developer has long term plan to build schools, hospitals and retail space within the project area.

  • Water supply (sweet water) to this project will be provided by Kalyan Dombivli Muncipal Corporation. The developer has also assured that water supply will be available for 24 hours.

2

Research & Consultancy

Document info
Document views19
Page views19
Page last viewedWed Dec 07 14:46:47 UTC 2016
Pages6
Paragraphs142
Words1539

Comments