X hits on this document

98 views

0 shares

0 downloads

0 comments

3 / 30

STUDENT’S NAME:  AKASH MITRA & RAHUL SINGH

Project Title: Study of Production system for implementation of Quick Response

Project Guide: Prof.T.Bhattacharya

Background: The project was undertaken to determine the structure and the operational production/ inventory policies of apparel supply system suited best to support rapid replenishment to retail in order to maximize performance.

Objective: Objective is to cut lead times- for the time-to market is very low in this case-this could be achieved by enhancing information- flow by installing a seamless system

Methodology: Study of various production systems.

                        Study of role QRM methodology.

                        Study of Product characteristics and demand uncertainty.

                        Evaluating various manufacturing systems.

                        Comparison of various manufacturing system w.r.t. to QRM

                        Proposed new production system which is a hybrid of UPS & MODULAR.

Findings: Analysis of QRM, UPS, PBS, SKU showed QRM is best suited.

Conclusion: It has been found out by us during this research work that among the three Production systems, modular has the best advantage over the other two production systems in QRM implementation.

Document info
Document views98
Page views98
Page last viewedTue Jan 17 21:25:14 UTC 2017
Pages30
Paragraphs269
Words5909

Comments