X hits on this document

Word document

I. Name of the Institution - page 14 / 16

37 views

0 shares

0 downloads

0 comments

14 / 16

i)  H.O.D ( Engineering & Product Planning & Control Deptt. ) – 4 yrs

From July 91 to March’ 95 served as HOD (Engg. & planning) in Electronic division of Instrumentation Limited (A Govt. Of India Undertaking) engaged in Manufacture System Engineering and Erection & commissioning of Automatic Control Systems, for thermal power plants and process industries, Electronic Telephone Exchanges as per CDOT design. As Engineering & planning head, I led a team of 30 engineers & officers engaged in system and shop level design, and Production, Planning & control of Electronic Automatic Telephone Exchanges.

ii) Regional Manager : From 1985 to 1990 –   6 yrs  

Looked after Erection & Commissioning activities of Electronic Control & instrumentation equipment on turn key basis for Large Thermal Power Plants in the States of U.P, Punjab & Haryana as head of Regional Office of Instrumentation Limited stationed at Lucknow.

iii)

Manager (System Engineering) –   14 yrs

After joining Instrumentation Limited an Engineering Trainee in 1971, I served as system Engineer, Sr. Engineer, Dy. Manager, and Manager in System design wing of commercial unit of Instrumentation Limited till 1984.

Hobbies & interest :   Reading books & Playing cards (Bridge)

Present salary:  Rs. 50000 /pm + Furnished Accommodation + Company car

Ajai Kumar Singh

- 14 -

Document info
Document views37
Page views37
Page last viewedTue Dec 06 14:46:15 UTC 2016
Pages16
Paragraphs913
Words2702

Comments