X hits on this document

PDF document

PAC09-Conference-Guide.pdf - page 136 / 231

656 views

0 shares

0 downloads

0 comments

136 / 231

TU6RFP022

First Results for the Beam Commissioning of the CERN Multi-Turn Extraction S.S. Gilardoni, F. Arnold Malandain, E. Benedetto, T. Bohl, S. Cettour Cave, K. Cornelis, H. Damerau, F. Follin, T. Fowle , F. Franchi, P. Freyermuth, H. Genoud, R. Gi- achino, M. Giovannozzi, S. Hancock, Y. Le Borgne, D. Manglunki, G. Metral, L. Pereira, J.P. Ridewood, Y. Riva, M. Schokke , L. Ser- meus, R.R. Steerenberg, B. Vandorpe, J. Wenninger (CERN)

TU6RFP023

Installation and Hardware Commissioning of the Multi-Turn Extraction at the CERN Proton Synchrotron S.S. Gilardoni, D. Allard, M.J. Barnes, O.E. Berrig, A. Beuret, D. Bodart, P. Bourquin, R. Brown, M. Caccioppoli, F. Caspers, J.-M. Cravero, C. De Almeida Martins, C.G.A. Dehavay, T. Dobers, M. Dupont, G. Favre, T. Fowle , F. Franchi, M. Giovannozzi, J. Hansen, M. Karppinen, C. Lacroix, E. Mahne , V. Mertens, J. Monteiro, R. Noulibos, E. Page, R. Principe, C. Rossi, L. Sermeus, R.R. Steerenberg, G. Vandoni, G. Villige , Th. Zickler (CERN)

TU6RFP024

Initial Results from Beam Commissioning of the LHC Dump System B. Goddard, I.V. Agapo , E. Carlie , L. Ducimetiere, E. Gallet, M. Gy , L.K. Jensen, O.R. Jones, V. Kain, T. Krame , M. Lamont, M. Meddahi, V. Mertens, T. Risselada, J.A. Uythoven, J. Wenninge , W.J.M. Weterings (CERN)

132

2009 Particle Accelerator Conference

TU6RFP025

O

p e r a t i o n a

lC

o n s i d e r a t i o n s f o r

th

e

P S B H - I

n j e c t i o n

S

y s t e m

  • W.J.M. Weterings, M. Aiba, J. Borburgh, C. Carli, T. Fowle , B.

Goddard, H. Vincke (CERN)

TU6RFP026

Beam Commissioning of Injection into the LHC V. Mertens, I.V. Agapo , B. Goddard, M. Gy , V. Kain, T. Krame , M. Lamont, M. Meddahi, J.A. Uythoven, J. Wenninger (CERN)

TU6RFP027

Resonant Third-Integer Extraction from the PS2 M. Gyr, W. Bartmann, M. Benedikt, B. Goddard, M. Meddahi (CERN) A. Koschik (ETHZ) D. Mayani Paras (UNAM)

Tuesda ,

May 5

TU6RFP016

Klystron Cathode Heater Power Supply System Based on the High-Voltage Gap Transformer P.A. Bak, A.A. Ko- repano , V.D. Zabrodin (BINP SB RAS) V. Vogel (DESY)

vailability Power Supply D.J.

TU6RFP018

10 Hz Pulsed Power Supplies and the DC Septum Power Supply for the ISIS Second Target Station (TS-2) S.L. Birch, S.P. Stoneham (STFC/RAL/ISIS)

TU6RFP019

Elettra Booster Magnet Power Supplies: One Year of Opera- tions R. Visintini, D.M. Molaro (ELETTRA)

TU6RFP020

Magnet Power Supplies for FERMI@Elettra R. Visintini, M. Cautero, D.M. Molaro (ELETTRA)

TU6RFP017

Digitally Controlled High MacNair (SLAC)

TU6RFP021

New Generation Transtechnik Modular Power Supply

MoPS

for

ccelerators

  • M.

Hohmann

(

ranstechnik)

TT-

Document info
Document views656
Page views656
Page last viewedSun Dec 11 01:00:42 UTC 2016
Pages231
Paragraphs7958
Words66350

Comments