X hits on this document

511 views

0 shares

0 downloads

0 comments

95 / 231

MO6PFP015

Fabrication and Production Test Results of Multi-Element Corrector Magnets for the Fermilab Booster Synchrotron G. Velev, J. DiMarco, C.C. Drennan, D.J. Harding, V.S. Kashikhin, S. Kotelniko , J.R. Lackey, A.V. Makaro , A. Makul- ski, R. Nehring, D.F. Orris, W. Pellico, E. Prebys, P. Schlabach, D.G.C. Walbridge (Fermilab)

MO6PFP016

Magnetic Field Calculations for the Magnets of the High- Energy Storage Ring (HESR) at F IR H. Soltner, U. Bechst- edt, R. Tolle (FZJ) J.G. De Villiers (iThemba LABS)

MO6PFP017

Magnetic Field Control in Synchrotrons A. Peters, E. Feld- meie , R. Steiner (HIT) H. Eickhof , T. Knapp, C.P. Welsch (GSI) C. Schömers (MPI-K)

MO6PFP018

The Pulsed Magnet System for the Simultaneous Injection of KEK-PF and KEKB Ring T. Mimashi, K. Furukawa, N. Iida, K. Kakihara, M. Kikuchi, T. Miyajima, S. Nagahashi, M. Sato, M. Tawada, A. Ueda (KEK) T. Kudo (MELCO SC) H. Mori (Nichicon (Kusatsu) Corporation)

MO6PFP019

Development of Pulsed Bending Magnet for Simultaneous Top-Up Injection to KEKB and PF M. Tawada, M. Kikuchi, T. Mimashi, A. Ueda (KEK)

MO6PFP020

Design Study of Superconducting Final Focus Quadrupoles for the Super KEKB Interaction Region M. Tawada, Y. Fu- nakoshi, H. Koiso, N. Ohuchi, K. Oide, K. Tsuchiya (KEK)

MO6PFP021

Field Measurement System for CYCHU-10 J. Yang, L. Cao, T. Hu, D. Li, K.F. Liu, B. Qin, J. Xiong, Y.Q. Xiong, T. Yu (HUST) C.J. Chu (CIAE)

MO6PFP022

Main Magnet and Central Region Design for a 10 MeV PET Cyclotron B. Qin, M. Fan, D. Li, K.F. Liu, Y.Q. Xiong, J. Yang (HUST) C.J. Chu (CIAE)

MO6PFP023

Development of a Feedback Control System for Resonant Power Supplies in J-P RC 3-GeV Synchrotron Y. Watanabe (JAEA/J-PARC)

MO6PFP024

Permanent Magnet Final Focus Doublet R&D for ILC at TF2 Y. Iwashita, T. Sugimoto (Kyoto ICR) M. Masuzawa, T. Tauchi, K. Yokoya (KEK)

MO6PFP025

Effect of Errors of Manufacture on the Magnetic Field of Quadrupole Lenses O.V. Ryezayev (NSC/KIPT)

Vancouver BC, May 4 – 8

91

Monda , May 4

MO6PFP014

LB

Synchrotron Quadrupoles and Sextupoles Manufac-

turing and Measurements S.M. Gurov,

A.M. Batrako

,

M.F.

Blino

, A.E. Leviche

, E.B. Leviche

, P. Martyshkin, I.N. Okune

,

V.V.

Petro

,

S.I.

Ruvinsky,

T.V.

Rybitskaya,

A.V.

Semeno

,

A.V.

Sukhano (ALBA)

, P. Vobly (BINP SB RAS) E. Bote , D. Einfeld, M. Pont

Document info
Document views511
Page views511
Page last viewedSun Dec 04 18:35:43 UTC 2016
Pages231
Paragraphs7958
Words66350

Comments