X hits on this document

PDF document

Prince William Sound Area Exercise 2004 - page 4 / 5

9 views

0 shares

0 downloads

0 comments

4 / 5

PWS AreaEx 04 ESC Draft Objectives

2004 PREP Area Exercise Objective Development

Major PREP Components to be Exercised (Major Objectives of Steering Committee)

Specific PREP Components to be addressed during development of Supporting Objectives by Joint Design Team

3.1

Unified Command: Demonstrate the ability of the spill response organization to work within a unified command.

3.1.1

3.1.2

3.1.3

3.1.4

3.2.1

Federal Representation: Demonstrate the ability to consolidate the concerns and interests of the other members of the unified command into a unified strategic plan with tactical operations. State Representation: Demonstrate the ability to function within the unified command structure. Local Representation: Demonstrate the ability to within the unified command structure. Responsible Party Representation: Demonstrate the ability to function within the unified command structure. Operations: Demonstrate the ability to coordinate or direct operations related to the implementation of action plans

contained in the respective response developed by the unified command.

and contingency plans

3.2.2

Planning:

Demonstrate

the

ability

to consolidate the various

concerns

of the members

planning

recommendations

of the unified command and specific long range

into joint strategic

4.0

Source Control: Demonstrate the ability of the spill response organization to control and stop the discharge at the source.

3.2.5

3.2.6

plans. Demonstrate the ability to develop short—range tactical plans for the Operations division. Public Affairs: Demonstrate the ability to form a joint information center and provide the necessary interface between the unified command and the media. Safety Affairs: Demonstrate the ability to monitor all field operations and ensure compliance with safety standards. None Specified. TBD by JDT.

5.0

Assessment: organization to

Demonstrate the ability of the spill response provide an initial assessment of the discharge

None Specified. TBD by JDT.

and provide continuing assessments of the effectiveness of the

tactical operations.

Enclosure (1) to ESC meeting minutes from 29-Sep-03

1 of 2

Document info
Document views9
Page views9
Page last viewedMon Dec 05 09:54:05 UTC 2016
Pages5
Paragraphs203
Words1467

Comments