Amgen TOP Requirements

EOS requires that all project turnover packages are delivered to Amgen in this predefined format. The responsibility of formatting the TOP is placed on the General Contractor. Amgen recognizes that the General Contractor may need input and documentation from other consultants, such as the A/E, but it is still the GC’s responsibility to coordinate and manage the TOP process and deliver the completed package.

All General Contractors working on Amgen projects have to comply with EOS requirements for the TOP as the baseline. Depending on the project scope or type, the General Contractors may also be requested to comply with an extended set of baseline requirements, such as Manufacturing, Validation, Maintenance, EH&S or other requirements.

The following sections of this guide address the Engineering and Manufacturing baseline requirements for the TOP documentation.

Engineering Baseline TOP Requirements This section explains the mandatory Engineering baseline TOP requirements that every project should comply with.

The turnover package should include both hard copies and electronic copies of every document. The documents should be delivered to Amgen in the following three forms:

  • Binder sets

  • Drawing sets

  • Electronic media

Turnover Package