X hits on this document

198 views

0 shares

0 downloads

0 comments

65 / 66

  • 5.

    PART 5 – AS-BUILT DRAWINGS

    • 5.1

      All as-built shop drawings must be submitted clearly labeled with the binder section number that they reference. Owner must receive one reproducible (Mylar or vellum) and two copies of bluelines or blacklines.

  • 6.

    PART 6 – DIVISION REQUIREMENTS, CSI FORMAT Requires approved specification, submittals, guarantee letters, keys (if required) and shop drawings (insert list only if more than one drawing; roll drawings and label with tab number around roll).

    • 6.1

      Division 1 – General Requirements

6.2

Division 2 - Sitework

    • 6.3

      Division 3 - Concrete

    • 6.4

      Division 4 – Masonry

    • 6.5

      Division 5 – Metals

    • 6.6

      Division 6 – Wood and Plastics

    • 6.7

      Division 7 – Thermal and Moisture Protection

    • 6.8

      Division 8 – Doors and Windows

    • 6.9

      Division 9 – Finishes

    • 6.10

      Division 10 – Specialties

    • 6.11

      Division 11 – Equipment

    • 6.12

      Division 12 – Furnishings

    • 6.13

      Division 13 – Special Construction

    • 6.14

      Division 14 – Conveying Systems

    • 6.15

      Division 15 – Mechanical

    • 6.16

      Division 16 – Electrical

    • 6.17

      Division 17 – Instrumentation

Appendix

G-3

Document info
Document views198
Page views198
Page last viewedWed Jan 18 10:56:14 UTC 2017
Pages66
Paragraphs1660
Words11995

Comments